Construction Infrastructure
Mumbai Metro: MMRDA completes overhead electrification work
The Mumbai Metropolitan Area Development Authority (MMRDA) completed overhead line electrification works on the 20 km test section connecting Charkop Depot and Aare station on metro line 2A (Dahisar to DN Nagar) and line 7 (Dahisar East to Andheri East). .
With this, the test on said route will begin on May 31. The Made in India metro rake manufactured by Bharat Earth Movers Limited (BEML) will be used for the test.
The overhead line maintenance vehicle (CMV) provided by Bharat Earth Movers Limited (BEML) for the electrification of the overhead line was beneficial. This vehicle is designed for periodic inspection, patrolling and maintenance of aerial equipment.
Mumbai metro lines 2A and 7 will operate on 25kV 50Hz AC power. This marks an important milestone for the start of Metro’s targeted trial.
News Source: ConstructionWorld
Construction Infrastructure
The Adani Enterprises unit has received a letter of approval for an NH project in Maharashtra
Adani Road Transport Ltd (ARTL), a wholly owned subsidiary of Adani Enterprises, has received LoA for a project involving six laning of Kagal-Satara section of NH-48 (old NH4) in Maharashtra. The project will be executed under the Bharatmala Pariyojana at ₹2,008.47 crores. The construction period for the 67-km long road project is expected to be 2 years from the date of appointment and the concession period will be 18 years.
With this project award, Adani’s road portfolio will have total 14 projects with more than 5,000 lane km with asset value exceeding ₹41,000 crore spread across India.
-
Bollywood2 months ago
Aishwarya Rai maintains her stunning appearance in a new L’Oreal ad.
-
health and remedies2 months ago
The article discusses the potential health risks associated with swallowing dry ice
-
Music1 month ago
Sidhu Moosewala’s father and baby brother feature on Times Square billboard; fans react. Watch
-
Bollywood4 weeks ago
Rasha, the daughter of Raveena Tandon, discusses how trolling affects her: “I think in processing it, feeling bad for a bit.”
-
Bollywood1 month ago
The phrase “female-led projects” annoys Bhumi Pednekar. “It disgusts me deeply.”
-
Bollywood2 months ago
For this explosive advertisement, Aamir Khan and Darsheel Safary reconnect 16 years after Taare Zameen Par
-
Hollywood2 months ago
Ori, Gal Gadot’s fourth daughter, is welcomed into the world. “Being pregnant wasn’t easy,”
-
Entertainment2 months ago
Each of Vijay and Kamal Haasan donates ₹1 crore to the construction of Nadigar Sangam