Construction Infrastructure
Jharkhand State Road Project-1 by Rodic Consultants
Rodic Consultants has become a leader in the field of infrastructure consulting, with the most advanced engineering solutions, and a good record of timely completion of projects in the fields of roads, bridges, tunnels, railways, subways, hydropower, electricity, and electricity. Energy, urban and industrial development, water, environment, multimodal transportation, etc. Rodic was selected as the construction supervisor for the Jharkhand National Highway No. 1 project and helped complete the project within the timetable and allocated budget. Jharkhand is located along the main transportation corridor connecting New Delhi and Kolkata. However, inconvenient transportation limits the development of the state.
Jharkhand needs to significantly improve its road network to reduce intra-state differences and accelerate its economic growth. Output 1: National highway repaired and improved The project aims to repair and upgrade the 311 km national highway between Govindpur and Shahebganj to reach the 7m wide dual-lane standard. The improved road is the backbone of the northeastern part of the state, which is one of the most backward areas in the country.
This road connects to National Highway 2 and the larger network of national highways. Output 2: Improved project management system To ensure the smooth operation of the project, in accordance with the development goals of the government and ADB, a Project Performance Management System (PPMS) was developed and implemented to monitor and evaluate project performance related to impact, results, and output.
The following key performance indicators were monitored and evaluated: Project financial and physical progress Traffic Analysis Testing and inspection Web-based project monitoring system Road safety and value engineering social influence Environmental protection PPMS was developed by supervisory consultants; it includes computerized financial management, management information and quality assurance systems.
PPMS is used to monitor all aspects of the project during the construction and defect liability period. It generates progress reports and safeguards reports. The implementing agency is still using PPMS to monitor other projects. Project cost and financing After completion, the actual cost of civil engineering, which is the main component of the project cost, was US$15495 million, which was 9.72% lower than the estimated US$17163 million. ADB’s US$30.05 million contingency reserve was not used.
News Source : NBM&CW
Construction Infrastructure
The Adani Enterprises unit has received a letter of approval for an NH project in Maharashtra
Adani Road Transport Ltd (ARTL), a wholly owned subsidiary of Adani Enterprises, has received LoA for a project involving six laning of Kagal-Satara section of NH-48 (old NH4) in Maharashtra. The project will be executed under the Bharatmala Pariyojana at ₹2,008.47 crores. The construction period for the 67-km long road project is expected to be 2 years from the date of appointment and the concession period will be 18 years.
With this project award, Adani’s road portfolio will have total 14 projects with more than 5,000 lane km with asset value exceeding ₹41,000 crore spread across India.
-
india1 month ago
‘My support will be with new J&K govt’: L-G Manoj Sinha ahead of Omar Abdullah’s oath-taking ceremony
-
Politics1 month ago
New BJP government to take oath in Haryana on Oct 17, PM Modi to attend
-
Sports1 month ago
Score for the third day of the first test between India and New Zealand: Ravindra-Southee crushes IND, NZ leads by 299 at lunch
-
TV1 month ago
Prince Narula and Yuvika Chaudhary share first pic with newborn daughter from hospital. See post
-
In News3 weeks ago
SpiceJet announces 8 new flights to connect Jaipur with Varanasi, Amritsar and Ahmedabad
-
Business3 weeks ago
OpenAI buys new domain chat.com for over $15 million, it redirects to ChatGPT
-
World News4 days ago
Who is Harun Abdul-Malik Yener? Florida man arrested over bomb threat to New York Stock Exchange
-
Entertainment.1 month ago
Massive data breach at Game Freak studios reveals shocking new dark Pokemon movie plot