Connect with us

India Hot Topics

Athlete allegedly dropped for event in Poland by SAI as they can’t ‘send woman alone’

Published

on

Athlete allegedly dropped for event in Poland by SAI as they can’t ‘send woman alone’

Even while the whole country is cheering the achievements of Indian women athletes at the ongoing Tokyo Olympics, a female athlete with hearing impairment from the Kanyakumari district of Tamil Nadu with an outstanding track record has been dropped from participating at the 4th World Deaf Athletics Championships to be held from August 23-28 in Poland.

Sameeha Barwin, being the only female sports person among the Indian athletes who were selected during the national trials, was allegedly dropped by the Sports Authority of India (SAI) as it was unwilling to send a female athlete alone with five male athletes to Poland.

The 18-year-old Sameeha, who has 90% hearing impairment, is a long jump and 100-metre track athlete who had been competing since the age of 12. Sameeha has won gold medals at three national athletic championships for deaf athletes held in Jharkhand in 2017, Chennai in 2018 and Calicut in 2019.

Advertisement

Speaking to TNM, Salamath, Sameeha’s mother says that Sameeha has broken the 1986 record set in 100 metre track, and although she initially was against her daughter pursuing sports she later agreed as Sameeha was good. “My daughter is an excellent athlete. And the federation has wronged Sameeha by dropping her for such silly reasons. More than anything, I am now fighting for her dignity,” says Salamath.

News Source : Op India

Advertisement

Construction Infrastructure

Greater Noida Land hurdle cleared for road linking Knowledge Park 3 with LG chowk

Published

on

By

Greater Noida Land hurdle cleared for road linking Knowledge Park 3 with LG chowk

The Greater Noida authority is set to issue a tender to finalise a contractor to build a 1.5km stretch of a key road connecting LG Chowk to the education hub in sector Knowledge Park 3. The private firm owning the land has agreed to give it away for the road project after 15 years of negotiations. The authority will build a central verge, drainage network, horticulture.

work to beautify the road, which has witnessed frequent road accidents due to its half-built state. The authority will issue a tender to finalise a contractor, approving a budget of ₹31 crore for the project. The road is expected to take six months to build, as the current road is half-built from the education hub to LG Chowk and the other half is not built due to land issues.

Advertisement

Greater Noida is set to build a bridge across the Hindon river, connecting the education hub road to Noida’s busy areas. The work has been expedited after resolving a land dispute, as the road will witness heavy traffic once the bridge is ready. The authority will build a central verge, drainage network, and horticulture work to beautify the road, which has experienced frequent.

Road accidents due to its half-built nature. Once the bridge is completed, commuters will travel through the road with ease and reach Noida from Greater Noida in five minutes. The bridge and road stretch will alleviate the need for commuters heading towards LG Chowk and Surajpur to traverse the Noida-Greater Noida Expressway up to Pari Chowk, reducing travel.

Distance by at least 10 kms and easing congestion around Pari Chowk The Greater Noida Authority has resolved a longstanding land acquisition issue, paving the way for the construction of a crucial 1.5 km road linking LG Chowk to Knowledge Park 3. This development is expected to significantly alleviate traffic congestion at Pari Chowk.

  • Project Overview: The proposed six-lane road will feature three lanes in each direction, service roads, a central verge, and a comprehensive drainage system. These enhancements aim to improve traffic flow The road is being connected with Noida’s sectors 144, 145, and 146 through a new and do bridge being built across Hindon and enhance connectivity between key educational hubs in the region and reduce waterlogging during the monsoon season.
  • Land Acquisition Resolution: The land, previously owned by Super Cassettes Industries Ltd (T-Series), was a major bottleneck for the project. After extensive negotiations, the company has agreed to provide the necessary land for the road construction. Under the agreement, T-Series will retain 40% of the undeveloped land against external development fees, while the Greater Noida Authority will acquire.
  • Impact on Commuters: The new road is anticipated to benefit approximately 5 lakh people, providing a smoother and more efficient route between Knowledge Park 3 and LG Chowk. This will not only ease daily commutes but also support the region’s growing educational and commercial sectors This initiative reflects the Greater Noida Authority’s commitment to enhancing urban infrastructure.
  • A major hurdle has been cleared for the construction of a crucial 1.5 km road linking Knowledge Park 3 with LG Chowk in Greater Noida. The road aims to ease traffic congestion connectivity in the region, particularly benefiting the educational hubs.
  • The road project, designed to be a six-lane road with three lanes in each direction, will feature service roads, a central verge, and an efficient drainage system. These improvements are expected to enhance traffic flow and reduce waterlogging during the monsoon season, contributing to smoother commutes for the local population.
  • Group Media Publication
  1. Construction, Infrastructure and Mining   
  2. General News Platforms – IHTLive.com
  3. Entertainment News Platforms – https://anyflix.in/

Advertisement
Continue Reading
Anyskill-ads

Facebook

Trending

05:36